Config and Document Control Modules

Font Correlation Table (½ day) includes:

  • Techniques for setting up font correlation tables
  • Tips for identifying bad mappings
  • Mapping of Special Characters / Glyph Mapping
  • Adding or Changing Color
  • Instructions for Embedding fonts in the Output
  • Font editors and Conversion tools

Xenos Field Technology (½ day) includes:

  • Defining fields for Data Extraction
  • Fixed position and Floating (trigger-based) Fields
  • Text joining parameters (extracting phrases, paragraphs, and tables)
  • Internal Format

d2e Platform Configuration for IDC (½ day) includes:

  • IDC Architecture and Components
  • IDC Installation and recommended file structure
  • IDC Execution and command files
  • Q-Monitor use and parameters (workstation only)
  • Sample JCL for IDC Execution (mainframe only)
  • DME / JS parameters including using Xenos d2e Controller

d2e Platform IDC Scripting (1-2 days) includes:

  • General Scripting Techniques
  • Using the Xenos d2e for Developers for data extraction field definition and scripting
  • Field Parameters and extraction script commands
  • Writing scripts that
    - use extracted field information to identify page or document types
    - use extracted field information to make processing decisions
    - generate outputs that are selected pages from the input
    - generate index or spreadsheet files from extracted field data
    - do database look-ups and use database information in rules processing
    - generate multiple outputs simultaneously
  • E-mail Distributor Configuration and Scripting (½ day) includes:
  • E-mail Distributor Configuration – interfacing with your e-mail server
  • E-mail Distributor Parameters and script commands
  • Writing a script that generates and sends e-mails
  • FTP Distributor Configuration and Scripting (½ day) includes:
  • FTP Distributor Configuration – interfacing with your ftp server
  • FTP Distributor Parameters and script commands
  • Writing a script that generates and sends FTPs

d2e Vision Project Workflow Components (1- 2 days) includes:

  • Simple Branch
  • Document Breaking
  • Best Viewed Rotation
  • Constant Print
  • Bookmarking
  • URL Link
  • Table of Contents
  • Indexer and Index Writer
  • Extension Components (optional)

d2e Vision Configuration and Integration (½ day) includes:

  • Implementation Guidelines
  • Directory Structure
  • Running in Production
  • IO Exit Handlers

d2e Vision API (2-3 days) includes:

  • Basic Overview
  • Xenos d2e Vision Engine and Job Manager
  • Message Handling (optional)
  • IO Handlers (optional)
  • Resource Version Controller (optional)
  • Xenos Intermediate Format (XIF) (optional)

Click here to view standard recommended schedules

To learn more

Speak to a Xenos representative today

Or if you prefer, email us at: info@xenos.com